Demonstration document. Rendered from a real list nepokretnosti obtained through the register's public information view, to validate the report format against actual data. Individual owners' names are replaced with placeholders under our own data-minimisation rule; identifiers and addresses are redacted by the register itself and never reach us. Every other value is exactly as printed. The location and planning section is omitted rather than filled with invented values, because that data layer is not yet integrated.
Listar
Property intelligence · Montenegro
Report
LS-2B8H
Issued
20 Aug 2026, 22:45
Data as of
13 Jan 2026, 21:38
Prepared for
Example
Property due diligence report

Cadastral municipality DONJI ŠTOJ, property sheet 2023

Regional unit ULCINJ · Transcript (complete) (PREPIS) · Area 362 m²
52 out of 100 Elevated risk

This property carries findings that should stop a transaction until they are resolved.

No building permit.

Checks: 12 · Critical: 1 · Serious: 0 · Attention: 1

Title itself is straightforward: ownership reconciles and no financial charge is registered.

01

Findings

Ranked by severity
Critical
No building permit

The register records that the structure was built without a building permit, usually citing the decision that established it. This is the same defect as the unlawful-construction note, worded differently by a different office — both are treated identically in the assessment. The description normally names the decision number and date, which is what a lawyer will need in order to advise on the legalization route.

Nema dozvolu RJEŠENJE 954-1516/18 OD 25.07.2018.G. - OBJEKAT IZGRADJEN BEZ GRADJEVINSKE DOZVOLE .

Attention
Not recorded for 3 of 3 objects

The register shows a construction year of zero, which means not recorded rather than unknown-and-old. On its own this is a data gap, not a defect. It matters more when the property also carries an unlawful-construction note, because which legalization route applies depends on when the structure was built — and here there is no register evidence of that date.

Clear
Parcel component areas sum to the printed total
Clear
Registered shares reconcile to whole ownership
Clear
No pending application appears on the extract.

A pending application is one that has been filed and not yet decided. When it is decided, the decision takes effect from the date of filing — not the date of the decision. It therefore ranks ahead of anything registered in the meantime, including a purchase completed today. This is why an encumbrance section showing nothing alarming is not on its own sufficient: the entries that will exist tomorrow, with effect from last month, are listed here and nowhere else.

02

Parcel

Podaci o parceli
1862/1 · DONJI ŠTOJ
Land use Building Registered Acquired by Area
Family residential building (Porodična stambena zgrada) 1 Not recorded Construction (GRAĐENJE) 73 m²
Courtyard (Dvorište) Not recorded Purchase (KUPOVINA) 289 m²
Total 362 m² ✓
03

Ownership

Podaci o vlasniku ili nosiocu prava
Registered holder Identifier Right Share
[individual owner — name withheld] Redacted at source Ownership (Svojina) 1/1

Owner identification

The register withholds the holder's identification number and address in this view, so we never receive them and cannot store them. A seller can therefore be matched to this record by name alone; verifying that the person signing is the person registered remains the notary's task.

04

Buildings and separate units

Podaci o objektima i posebnim djelovima objekta
Object Building Structure Built Acquired by Area
Family residential building (Porodična stambena zgrada) 1 / — Ground plus one upper floor (JEDNOSPRATNA ZGRADA) Not recorded Construction (GRAĐENJE) 73 m²
Dwelling (Stambeni prostor)
Tri sobe
1 / 1 Ground floor (Prizemlje) Not recorded Construction (GRAĐENJE) 56 m²
Dwelling (Stambeni prostor)
Tri sobe
1 / 2 First upper floor (Prvi sprat) Not recorded Construction (GRAĐENJE) 56 m²
05

Encumbrances and restrictions

Podaci o teretima i ograničenjima
1 entry
Entry Affected object Entered What is sought
No building permit 1 1 October 2020 Nema dozvolu RJEŠENJE 954-1516/18 OD 25.07.2018.G. - OBJEKAT IZGRADJEN BEZ GRADJEVINSKE DOZVOLE .
06

Pending applications

Podaci o aktivnim zahtjevima

No pending application appears on the extract.

A pending application is one that has been filed and not yet decided. When it is decided, the decision takes effect from the date of filing — not the date of the decision. It therefore ranks ahead of anything registered in the meantime, including a purchase completed today. This is why an encumbrance section showing nothing alarming is not on its own sufficient: the entries that will exist tomorrow, with effect from last month, are listed here and nowhere else.

07

How the score was calculated

deterministic
Assessment Finding Points
Starting score 100
No building permit Entered 1 October 2020 −45
Parcel component areas sum to the printed total Clear 0
Registered shares reconcile to whole ownership Clear 0
Not recorded for 3 of 3 objects Attention −3
Unregistered structure — exists on the ground, absent from the register Not detectable from the register alone 0
No pending application appears on the extract. Clear 0
Mortgage None registered 0
Prohibition on disposal and encumbrance None registered 0
Note of pending litigation None registered 0
Enforcement proceedings None registered 0
Easement None registered 0
Right of use or habitation None registered 0
Final score — Elevated risk band (35–64) 52

Bands: 85–100 low · 65–84 moderate · 35–64 elevated · 0–34 high. The same inputs always produce the same score; no discretion is applied. An unlawful-construction note is weighted far more heavily than a mortgage on purpose: a mortgage is discharged at closing as a matter of routine, whereas legalization is an administrative procedure that can be refused. The score summarises what the register discloses. It is not a valuation and not a prediction.

Provenance and verification
Source document
DONJI ŠTOJ 2023 — PREPIS
Regional unit
ULCINJ
Issued by
Real Estate Administration of Montenegro — public information view
Document timestamp
13 Jan 2026, 21:38
Analysis engine
Listar v0.1
Verify this report
listar.info/verify/LS-2B8H
Scope and limitations

This report is an analysis of a property register extract, prepared by software. It is informational and is not legal advice, a valuation, a title guarantee, or a substitute for review by a qualified Montenegrin lawyer or notary before a binding transaction.

The source extract was obtained through the register's public information view and is not an officially certified document. It is not reproduced or supplied with this report. Where an official certified extract is required, it must be obtained from the authority directly.

The register reflects what has been recorded, which is not always what exists on the ground. Findings are accurate as at the document timestamp shown above. Where this report notes an absence, that means nothing was recorded on the extract examined — not that nothing exists.

Entries quoted from the register are reproduced verbatim in their original language and are never machine-translated. The original wording is the legally operative text; our explanation of what a given type of entry means is our own and is provided for orientation only.

Prepared by Nova Sidera D.O.O., Montenegro.

Report LS-2B8H DONJI ŠTOJ 2023 · Data as of 13 Jan 2026, 21:38